


Deal Type
Industry
Deal Status
NORDESTE IRON MINING COMPANY
MINING COMPANY
OF IRON
Northeast Region
SEARCH
Resources certified by SRK Consulting
1
TESTIMONIES
Prefeasibility
Valuation
study
revision
by
.
SRK
Wood Mackenzie
Consulting
by
annual
production
of
15
Mtpy
of
Premium Pellet
feed
Finnic
two
RESERVE
3
HIGH QUALITY
4
DOCUMENTATION
Mining Installation
and
Energy
plant
concession license
issued (LI) for
by the
the mine
Brazilian
mining beneficiation
and
ministry
and issued
,to the
well
. to the
the
logistical
supporting
infrastructure
5
PROJECTS
Basic CAPEX
.
engineering
been
in 2018
have Ausenco
concluded
by
CNS
Lavalin
revised
by
6
ENGINEERING
7
PRIVATE HARBOR (TUP)
8
PORT OF SUAPE PRIVATE TERMINAL (TUP)
•Area: 45 ha
•Storage capacity: 760,000 ton
• Car dumper : Double Tanden
• Pier to Ship with capacity 220,000 tons
• Lengths: 320 m
•Current draft: - 15.50 m - 20.00 m
• Proposed draft: - 20.00 m
No Files Attached